PI003 | Actual unavailability V4.0

Performance Indicator

This PI captures the ship’s actual unavailability.


DefinitionThe number of hours actually lost to ship-owner due to interruption of service in the given quarter.
UnitHOURS
ScopeReported on a ship level
Calculation periodCaptured and reported on a quarterly basis.
ReferencesThis Performance Indicator - PI003 - is used by the following Key Performance Indicators
KPI032Ship availability
PI003Actual unavailability
PI062Planned unavailability
Example

Actual unavailability:
Quarter1: 15 hours (11 hours ME maintenance plus 4 hours cargo crane repairs)
Quarter2: 130 hours (88 hours planned Drydocking plus 42 hours steaming TO shipyard), 
Quarter3: 4 hours (2 hours ME maintenance plus 2 hours delay to repatriate sick crew), 
Quarter4: 186 hours (180 hours Hot Layup plus 6 hours hull cleaning/shaving)